Currently Bidding

BIG CREEK BRIDGE

  • December, 11 2017 2:00 PM
  • Sandpoint, ID

Project Role

Primary Contractor

Estimator

Todd Moore

Scope

Removal of existing steel culvert and constructing a 60ft long x 24ft wide useable precast, pre-stressed concrete trideck bridge with a driven steel piling foundation and concrete pile cap. Installation of a public detour route/ structure, excavation, rip-rap, T1 01 bridge railing, cast-in-place concrete caps, road construction, approach guardrail, seeding, etc.

Description

Removal of existing steel culvert and constructing a 60ft long x 24ft wide useable precast, pre-stressed concrete trideck bridge with a driven steel piling foundation and concrete pile cap. Installation of a public detour route/ structure, excavation, rip-rap, T1 01 bridge railing, cast-in-place concrete caps, road construction, approach guardrail, seeding, etc.

Interested? Submit a Quote

To submit a quote for a project we are bidding, either send email to bids@nadinc.com or fax to (509) 927-2010.


Please send bid questions to the same email and an estimator will respond.