Bid Won

KNOX SIDEWALK PROJECT SARGENT TO HUTCHINSON

  • April, 05 2019 10:00 AM
  • Spokane Valley, WA

Project Role

Primary Contractor

Estimator

Mark Johnson 509-928-3333

Scope

Curb and sidewalk, pedestrian curb ramps, pavement widening, bio-infiltration swale, catch basins, drywell and storm drain work, etc.

Description

Curb and sidewalk, pedestrian curb ramps, pavement widening, bio-infiltration swale, catch basins, drywell and storm drain work, etc.